Financial injection from local and regional  municipalities for energy renovation and RES installation directed towards citizens in 2024 ( in first three months in 2024)

Marketplace

 

 

 

 

 

Croatian local authorities have joined in the co-financing of energy efficiency measures and the installation of renewable energy systems in 2024. In the first quarter of this year, five cities (Đakovo, Makarska, Rijeka, Križevci, and Omišalj), three municipalities (Čavle, Vrsar, and Matulji), and three counties (Lika-Senj County, Karlovac County, and Zadar County) have opened calls for citizens. The main measures being promoted include the installation of photovoltaic systems, EE mesures, subsidizing interest rates, conducting energy audits, and issuing energy certificates for family homes. Also city of Križevci encourage the installation of photovoltaic systems to combat energy poverty also in combination with EE measures –  such measures are very needed.

In the following section, take a look at the overview of the calls in the first quarter of 202:

City of Rijeka

  • Public tender for photovoltaic systems
  • The deadline for application is until May 10, 2024
  • Funding covers up to 50 percent of the total installation cost for a photovoltaic power plant up to 5 kW, up to a maximum of 3,750 EUR per family house. Up to 50 percent of the total installation cost for a photovoltaic power plant from 5.01 to 10 kW, up to a maximum of 7,500 EUR per family house.

Link: Zgradonačelnik

City of Makarska

  • Public tender for photovoltaic systems
  • The application must be submitted no later than November 1, 2024, or until the funds are exhausted.
  • The funds are planned to be allocated so that co-financing of up to a maximum of 5,000 euros per family house can be achieved, or 400 euros per 1 kW of installed power plan. Funding covers project documentation and the main project

Link: Zgradonačelnik

Karlovac County

  • Public tender for photovoltaic systems
  • The deadline for application is October 31, 2026, or until the funds are exhausted.
  • The economic entity can be eligible for non-repayable support up to 100% of the stated project-technical documentation value, but no more than 5,000 euros. Funding covers project documentation and the main project for bussines sector

Link: Zgradonačelnik

Municipality of Vrsar

  • Public tender for photovoltaic systems
  • The public call is open until October 1, 2024, or until the allocated funds for the fiscal year are exhausted
  • Funding covers main electrical engineering project of household solar power plants.

Link: Zgradonačelnik

City of Đakovo

  • Public tender for EE measures
  • The public call is open until December 1, 2024, or until the allocated funds for the fiscal year are exhausted
  • co-finance investments in promoting energy efficiency in family houses with 20% of the total justified costs compared to the actual costs recognized by the Fund, up to a maximum amount of 3,981.68 euros per beneficiary.

Link: Zgradonačelnik

Zadar County

  • Public tender for photovoltaic systems
  • he deadline for submitting the application is May 31, 2024
  • Funding covers project documentation or the expenses of procurement and construction of a solar power plant

Link: Zgradonačelnik

Municipality of Matulji

  • Public tender for EE measures
  • The application must be submitted no later than February 21, 2024, or until the funds are exhausted.
  • Funding covers project documentation for energy renovation up to 70 %

Link: Zgradonačelnik

Lika-Senj County

  • Public tender for co-financing the preparation of an energy audit and energy certificates report for family houses
  • The application must be submitted no later than December 15, 2024, or until the funds are exhausted.
  • Funding covers costs for the preparation of energy audit reports and energy certificates for family houses up to 100 percent of the amount, but not exceeding 375 euros including VAT

Link: Zgradonačelnik

City of Omišalj

  • Public tender for photovoltaic systems
  • The application must be submitted no later than November 1, 2024, or until the funds are exhausted.
  • Funding covers Up to 1,000 euros for power plants up to 5.00 kW. Up to 2,000 euros for power plants from 5.01 to 11.00 kW. Up to 2,500 euros for power plants from 11.01 to 30.00 kW.

Link: Zgradonačelnik

City of Križevci

  • Public tender for photovoltaic systems
  • Public tender for photovoltaic systems and EE measures for energy poor households
  • The deadline for application is September 1, 2024, or until the funds are exhausted.
  • Funding covers – Co-financing the preparation of project documentation – development of the Main project for a solar power plant for electricity production in households connected to the grid . Co-financing energy efficiency in households, including the development of the Main project for a solar power plant and/or the construction of solar power plants, as well as the installation of thermal insulation for the ceilings of residential spaces for vulnerable groups of citizens at risk of energy poverty

Link: Zgradonačelnik

Municipality of Čavli

  • Public tender for Subsidizing interest rates on loans for individuals for energy renovation of buildings, such as installing thermal insulation, replacing roofs, and installing exterior joinery with double glazing.
  • The public call is open until October 31, 2024, or until the allocated funds for the fiscal year are exhausted
  • Funding covers – subsidizes the interest rate by 2.5%

Link: Zgradonačelnik